About us
Greetings
Mission and Vision
Business Area
History
Location
Car wash system
Large Car Wash System
Small car wash systems
Features
Installation Example
Tire wash system
Roller Type
Grating Type
Built-in generator Type
Movable iron PIT/Sludge Box
Installation Example
PR Center
Certificate and Award
Promotion Video
Brochure
ENTRA in the press
Customer Support
Notice
License and ordinance
FAQ
Q&A
Online Inquiry
About us
Greetings
Mission and Vision
Business Area
History
Location
Car wash system
Large Car Wash System
Small car wash systems
Features
Installation Example
Tire wash system
Roller Type
Grating Type
Built-in generator Type
Movable iron PIT/Sludge Box
Installation Example
PR Center
Certificate and Award
Promotion Video
Brochure
ENTRA in the press
Customer Support
Notice
License and ordinance
FAQ
Q&A
Online Inquiry
KOREA
We endeavor to fulfill
our promise
to become your valued partner.
Brochure
Download
ENG
KOR
Roller Type
Grating Type
Built-in generator Type
Movable iron PIT/Sludge Box
Installation Example
Movable iron PIT/Sludge Box
H
Tire wash system
Movable iron PIT/Sludge Box
Roller Type
Grating Type
Built-in generator Type
Movable iron PIT/Sludge Box
Installation Example
Movable Iron PIT
Sludge Box
Movable
Iron- PIT
Reduction of expense according to mobility /The tire washing system site is easy to install and thus reduces production costs
Sludge
Box
PIT 3D Drawing
* This basic drawing is for right-moving direction.
(For left-moving direction, please contact us.)
Foundation construction progress
* This basic drawing is for right-moving direction.
(For left-moving direction, please contact us.)
* Tail plate is optional.
01
Selection of the tire washing system location
02
Excavation commencement
03
Excavation completion
04
Rubble sorting
05
Vinyl packaging and concrete leveling
06
Distribution of foundation reinforcement
07
Completion of floor concrete placing (5,200x7200xT:200)
08
Installation of tire washing systems
09
Installation of tire washing systems
10
Refilling
11
Backfilling and compacting work on entry and exit
12
Reinforcement work on entry and exit (Specification: Iron D13@200)
13
Concrete pouring on entry and exit
14
Complete basic construction